Do you actually need planning?

Tell us where the project is and what you're building. We'll give you instant guidance on permission, permitted development, the documents you'll need and how long it usually takes.

Your project

Likelihood
Often permitted development

In Scotland, single-storey rear or side extensions to houses can often be built under permitted development (Class 1A/1B of the GPDO), subject to limits on size, height, position and materials. Rules in England are broadly similar under the GPDO 2015. Flats, listed buildings and conservation areas always need consent in both jurisdictions.

812 weeks typical

Permitted development possibilities

  • Scotland: rear extension ≤ 1 storey, ≤ 50% of original curtilage, not forward of principal elevation
  • Height ≤ 4 m; eaves ≤ 3 m if within 1 m of a boundary (Scotland) / 2 m (England)
  • Materials of similar appearance to the existing house
  • England equivalent: rear depth ≤ 4 m (detached) / 3 m (terraced or semi) under GPDO Class A

Documents typically required

  • Location plan (1:1250) & site plan (1:500)
  • Existing & proposed floor plans, elevations and sections
  • Design & Access Statement (if required by authority)
  • Planning application form & fee

Indicative guidance only, based primarily on Scottish planning legislation. England applies broadly similar rules but local plans, Article 4 directions and supplementary guidance vary. Always confirm with us or an architectural designer or the LPA before proceeding.

Next step

Talk it through with one of our team.

30-minute call, no obligation. We'll review your specific site, confirm the planning route and map out the documents you'll actually need.

Fill in the form — we'll be in touch within one working day.

Request a callback

Finished with the tool? Head back to the main Cole & Partners site.

Back to coleandpartners.org